ENP-552 Rev. A  July 26, 2017


Table of Contents


1. Introduction

2. Affective Units

3. Corrective Action

4. Tools and Materials

5. Procedure

5.1 Locating Leaks

5.2 General Procedures

5.2.1 Compression Fittings

5.2.2 O-ring Boss (ORB) Fittings

5.2.3 National Pipe Thread Taper (NPT) Fittings

5.2.4 Hose Barbs

5.2.5 JIC Fittings

5.2.6 Hose End Fittings

6. Depressurize the System 

7. O-rings

8. Torque Specifications for Fittings

9. Warranty

10. Proprietary Statement




© 2024 Hexagon Agility Inc. All Rights Reserved.
HEXAGON® and AGILITY® are Registered in U.S. Patent and Trademark Office.
Hexagon Agility Proprietary Statement